Controls & electrical design · for integrators & panel builders

Controls and panel design capacity, without the hire.

UL 508A and IEC 61439 panels, NFPA 79 and IEC 60204-1 machines, and ISA instrumentation packages. Drafted in your title block, checked, and delivered on schedule.

  • TB1-1Control panel design
  • TB1-2Machine automation electrical design
  • TB1-3Plant instrumentation design
SCROLL TO PLOT E-201 · 0%
1 · POWER CIRCUIT · 480 VAC 3Ø 60 Hz L1 L2 L3 DS-1 60 A NON-FUSED DISCONNECT FU-1…3 CLASS J · 25 A R/L1 S/L2 T/L3 RECTIFIER +DC−DC DC BUS IGBT INVERTER VFD-201 POWERFLEX 525 10 HP · 480 VAC 0.0 HZ EtherNet/IP TO PLC-1 U/T1 V/T2 W/T3 PE 3C #10 AWG · VFD CABLE M 3~ MTR-201 10 HP · 1765 RPM 2 · CONTROL CIRCUIT · 24 VDC PS-1 24 VDC · 5 A +24V 0V VFD-201 I/O PB-1STOP PB-2START SS-1FWD / REV SHLD POT-1 10 kΩ SPEED ES-1 SR-1 SAFETY RELAY STO CH A STO CH B RUN RELAY DRIVE RUNNING PLC-1 1769-IQ16 · I:0/0 01STOP 02START 03REV 04COM 12+10V 13AIN 14COM S1STO S2STO R1RUN R2RUN +24 VDC → E-202 / TB-1
SheetE-201
RevA
TitleVFD-201
ScaleNTS

Services

Design capacity, wired straight into your project.

Send the scope and I return a checked, issue-ready drawing package, drafted to the codes your project calls for, in your CAD platform and title block.

SheetE-202
RevA
TitleSERVICES
ScaleNTS
+24 VDC · Service bus · TB-1
  1. T1 · Control panels

    Control panel design

    Industrial control panels drawn to UL 508A or IEC 61439, from power distribution and PLC racks to the last terminal. Built so your shop can fabricate from the drawings without calling back.

    UL 508AIEC 61439NEC / NFPA 70SCCR

    Deliverables

    • Power & control schematics
    • Backpanel & door layouts, to scale
    • Bill of materials with part numbers
    • Wire & terminal schedules
    • SCCR calculation & nameplate data

    Turnaround

    7–10 days HOLD

    Starting at

    $1,800 HOLD
  2. T2 · Machines

    Machine automation electrical design

    Electrical design for conveyors, packaging lines and custom machines to NFPA 79 or IEC 60204-1. Motor control, safety circuits and I/O, laid out so the programmer and the electrician read the same sheet.

    NFPA 79IEC 60204-1ISO 13849EtherNet/IP · PROFINET

    Deliverables

    • Motor & drive schematics
    • E-stop, guard & STO safety circuits
    • I/O assignment & PLC card layouts
    • Network architecture drawing
    • Field device & cable lists

    Turnaround

    10–15 days HOLD

    Starting at

    $2,400 HOLD
  3. T3 · Process plants

    Plant instrumentation design

    Instrumentation packages for water, wastewater and process skids. Tagged to ISA-5.1, with loop diagrams and hookups your installers can work from in the field.

    ISA-5.1ISA-5.44–20 mA · HART

    Deliverables

    • P&ID development & markups
    • Instrument index & datasheets
    • Loop diagrams
    • Installation hookup details
    • Junction box & cable schedules

    Turnaround

    10–20 days HOLD

    Starting at

    $2,000 HOLD
Platforms
  • EPLAN Electric P8
  • AutoCAD Electrical
  • Allen-Bradley
  • Siemens
  • Beckhoff

Sample projects · Drawing index

Open the drawing set before you open a PO.

Six sample packages, two per service, across UL, NFPA, IEC and ISA standards. Each opens its own drawing set with the sheets, the level of detail and the standards you would get on your own job.

SheetE-203
RevA
TitleINDEX
ScaleNTS
SAMPLE PROJECT SP-01 · E-401

SP-01 · Control panel

Duplex pump station control panel

Standard
UL 508A · NEC 409
Scope
480 V · 2 × 25 HP VFD · CompactLogix
Sheets
14 HOLD
Open drawing set
SAMPLE PROJECT SP-02 · E-302

SP-02 · Machine automation

Case packer conveyor line

Standard
NFPA 79 · ISO 13849 PL d
Scope
6 conveyors · 3 guard zones · STO
Sheets
22 HOLD
Open drawing set
SAMPLE PROJECT SP-03 · I-101

SP-03 · Instrumentation

Chemical dosing and filtration skid

Standard
ISA-5.1 · ISA-5.4
Scope
38 instruments · 4–20 mA / HART
Sheets
18 HOLD
Open drawing set
SAMPLE PROJECT SP-04 · E-101

SP-04 · Control panel

Process cooling skid control panel

Standard
IEC 61439-2 · IEC 60204-1
Scope
400 V · 3 × 11 kW VFD · S7-1500
Sheets
16 HOLD
Open drawing set
SAMPLE PROJECT SP-05 · E-401

SP-05 · Machine automation

Robotic palletising cell

Standard
IEC 60204-1 · ISO 13849 PL d
Scope
Robot cell · 2 light curtains · muting · PROFINET
Sheets
20 HOLD
Open drawing set
SAMPLE PROJECT SP-06 · I-301

SP-06 · Instrumentation

Boiler feedwater and steam instrumentation

Standard
ISA-5.1 · ISA-5.4
Scope
52 instruments · 4–20 mA / HART · 3-element drum level
Sheets
24 HOLD
Open drawing set

Sample projects are original designs made for this portfolio. They are not client work and are not issued for construction.

Process · Sequential function chart

How a job runs, start to finish.

Six steps from your first email to drawings issued for construction. Every job follows the same chart, so you always know what happens next and when.

SheetE-204
RevA
TitlePROCESS
ScaleNTS

Typical job

2–3 weeks HOLD

Overlap with your working day

4 h / day HOLD

Review rounds included

2 HOLD
  1. S0

    Step 0 · Initial

    Send the brief

    Day 0

    Email what you have: P&IDs, a sequence of operation, red-line markups, an I/O list, even a photo of a hand sketch. Tell me the standard, your CAD platform and the date you need it.

    In
    Drawings or markups · Sequence of operation · Title block & templates · Due date
    Out
    NDA signed on request
    T1 · Brief received
  2. S1

    Step 1

    Scope & fixed quote

    ≤ 1 business day HOLD

    You get a written scope: deliverables, estimated sheet count, assumptions, exclusions, price and delivery date. A fixed price, so there are no hourly surprises.

    Out
    Scope & quote (PDF)
    T2 · Quote accepted, PO issued
  3. S2

    Step 2

    Kickoff call

    Day 1 · 30 min

    A short call in your morning. We lock the standard, symbol library, wire and device numbering, title block and who reviews the drawings.

    Out
    Kickoff notes · Drawing conventions sheet
    T3 · Conventions confirmed
  4. S3

    Step 3

    Draft & self-check

    5–15 business days HOLD

    Drawings are built in your platform. Every sheet is checked against a written checklist: cross-references, wire numbers, terminal assignments, SCCR and code clearances.

    Out
    Progress update every 2 days HOLD
    T4 · Checklist passed
  5. S4

    Step 4

    Issue for review

    Rev A

    You receive PDFs plus native files (EPLAN project or AutoCAD Electrical drawing set), with the bill of materials and wire schedule in Excel.

    Out
    Rev A package · Native CAD files · BOM · Wire schedule
    T5 · Markups returned
  6. S5

    Step 5

    Revise & issue for construction

    Rev 0

    Markups are worked in within 2 business days per round, and two rounds are included. The set is then issued for construction as Rev 0.

    Out
    Rev 0 package · Native CAD files
    T6 · Rev 0 issued → S0, ready for the next job