Controls & electrical design · for integrators & panel builders
UL 508A and IEC 61439 panels, NFPA 79 and IEC 60204-1 machines, and ISA instrumentation packages. Drafted in your title block, checked, and delivered on schedule.
Services
Send the scope and I return a checked, issue-ready drawing package, drafted to the codes your project calls for, in your CAD platform and title block.
T1 · Control panels
Industrial control panels drawn to UL 508A or IEC 61439, from power distribution and PLC racks to the last terminal. Built so your shop can fabricate from the drawings without calling back.
Deliverables
Turnaround
7–10 days HOLDStarting at
$1,800 HOLDT2 · Machines
Electrical design for conveyors, packaging lines and custom machines to NFPA 79 or IEC 60204-1. Motor control, safety circuits and I/O, laid out so the programmer and the electrician read the same sheet.
Deliverables
Turnaround
10–15 days HOLDStarting at
$2,400 HOLDT3 · Process plants
Instrumentation packages for water, wastewater and process skids. Tagged to ISA-5.1, with loop diagrams and hookups your installers can work from in the field.
Deliverables
Turnaround
10–20 days HOLDStarting at
$2,000 HOLDSample projects · Drawing index
Six sample packages, two per service, across UL, NFPA, IEC and ISA standards. Each opens its own drawing set with the sheets, the level of detail and the standards you would get on your own job.
SP-01 · Control panel
SP-02 · Machine automation
SP-03 · Instrumentation
SP-04 · Control panel
SP-05 · Machine automation
SP-06 · Instrumentation
Sample projects are original designs made for this portfolio. They are not client work and are not issued for construction.
Process · Sequential function chart
Six steps from your first email to drawings issued for construction. Every job follows the same chart, so you always know what happens next and when.
Step 0 · Initial
Email what you have: P&IDs, a sequence of operation, red-line markups, an I/O list, even a photo of a hand sketch. Tell me the standard, your CAD platform and the date you need it.
Step 1
You get a written scope: deliverables, estimated sheet count, assumptions, exclusions, price and delivery date. A fixed price, so there are no hourly surprises.
Step 2
A short call in your morning. We lock the standard, symbol library, wire and device numbering, title block and who reviews the drawings.
Step 3
Drawings are built in your platform. Every sheet is checked against a written checklist: cross-references, wire numbers, terminal assignments, SCCR and code clearances.
Step 4
You receive PDFs plus native files (EPLAN project or AutoCAD Electrical drawing set), with the bill of materials and wire schedule in Excel.
Step 5
Markups are worked in within 2 business days per round, and two rounds are included. The set is then issued for construction as Rev 0.